Discipline hub brief — draft. Organize the design around occupant experiences, controlled loads, scenes, time/occupancy behavior, override, and operational ownership.
Hub sections
- Rooms, loads, circuits, daylight/occupancy needs, users, schedules, desired scenes, manual control, and fallback.
- Keypads, dimmers/relays, sensors, panels/controllers, gateways, interfaces, and device-location coordination.
- Control/network topology, wired/wireless media, power, panels, cable paths, addressing/commissioning responsibility, and security.
- Floor plans, load/control schedules, keypad/scene schedules, risers/topology, BOM, scope, and integration matrix.
- Programming, functional testing, labeling, training, backups, service access, and change control.
Original evidence
Curate an original residential lighting-control floor plan, load/keypad/scene schedule, topology, and commissioning checklist.
Review
Qualified electrical, lighting, code, network, manufacturer, accessibility, and project-specific review is required.